Two Metro corridors to begin operations this 12 months in Kolkata

By means of: Specific Information Carrier | Kolkata |
Printed: January 14, 2018 6:13 am


“It (East-West hall) will duvet six stations — Sector V, Karunamoyee, Central Park, Town Centre, Bengal Chemical and Stadium. The signaling device, tracks and different options are in quite a lot of phases crowning glory,” stated a Metro respectable. (Specific Archives)

The New Garia Airport Metro hall between Kavi Subhash and Ruby Health facility, and the East-West Metro hall between Salt Lake’s Sector V and Phoolbagan, are more likely to get started operations this 12 months. Whilst the primary section of the East-West hall is predicted to be finished in mid-2018, the New Garia Airport Metro is slated to begin by means of the top of the 12 months.

“It (East-West hall) will duvet six stations — Sector V, Karunamoyee, Central Park, Town Centre, Bengal Chemical and Stadium. The signaling device, tracks and different options are in quite a lot of phases crowning glory,” stated a Metro respectable. Within the first section, trains have been intended to run between Sector V and Sealdah, however resources stated that the station at Sealdah will handiest be finished as soon as the tunnel-boring machines achieve Esplanade. This path is predicted to be able by means of 2019.

“As soon as those two routes are operational, numerous passengers who commute by means of roads will take the Metro, which can ultimately scale down site visitors, particularly right through rush hour,” stated some other Metro respectable.  Resources stated the primary section is nearing final touch. Whilst the East-West Metro hall will duvet a complete distance of 16.6 km, the primary section will duvet five km.

The Kolkata Metro Railway Company Restricted had not too long ago unveiled a demo trainer for the East-West Hall.  “This can be fruitful for other people inside the Salt Lake space. Those coaches can be working and not using a motorman. The coaches can be 2.88 mts extensive with a complete seating capability of 268 and status capability of one,782. Trains in this stretch may have a frequency of two.five mins right through height hours,” stated the Metro respectable.

For the entire newest India Information, obtain Indian Specific App

Leave a Reply

Your email address will not be published. Required fields are marked *

*